1. Check out the lot. No. so that installation can be applied with product of the same lot No.
2. Keep tiles the room temperature over 15¢ªC.
3. In case of installing below fifteen degrees, please use spacers as thick as a name card
   on the interval between tiles.
4. Keep adhesives over 5¢ªC.
1. Making inking line from the center of floor.(If you
   regard the center of the panel on the floor as a
   start point, it is available to half-overlapped intall-
   ation between double floor material and a tile
2. After applying adhesive overall and rolling floor,
   please wait a moment until the color of adhesive
   changed into the transparentness.
3. Install MAXI F&R TILE in accordance with
   the inking line.
4. Do not install files too tightly so that they
   do not come off the floor.
5. Install from the center to wall respectively, the
    surroundings of column and wall should be
    installed altogether.
1. Move heavy objects over protective mats after finishing installation.
2. Do not enter the site until inspection is finished.
*What is 1/2 overlapped installation?
1. When lay-out or wiring is changed half-overlapped installation make it possible
   to take 4 sheet of tile out in order to take a sheet of panel out. In case that panels and
   tiles install in the same line, take 9 sheet of tile.
2. Make sure no water enters the bottoms of panels directly.
3. In case of defective installation of double floor, it is available to be covered.