1.
Check out the lot. No. so that installation
can be applied with product of the same
lot No. 2. Keep tiles
the room temperature over 15¢ªC. 3.
In case of installing below fifteen degrees,
please use spacers as thick as a name
card on the interval
between tiles. 4.
Keep adhesives over 5¢ªC. |
|
 |
1.
Making inking line from the center
of floor.(If you regard
the center of the panel on the floor
as a start
point, it is available to half-overlapped
intall- ation
between double floor material and
a tile 2. After
applying adhesive overall and rolling
floor, please
wait a moment until the color of
adhesive changed
into the transparentness. 3.
Install MAXI F&R TILE
in accordance with the
inking line. 4.
Do not install files too tightly
so that they do
not come off the floor. 5.
Install from the center to wall
respectively, the
surroundings of column and wall
should be
installed altogether. |
 |
|
|
 |
1. Move heavy objects
over protective mats after finishing installation.
2. Do not enter the site
until inspection is finished. |
|
| *What
is 1/2 overlapped installation? |
1. When lay-out or wiring
is changed half-overlapped installation
make it possible to
take 4 sheet of tile out in order to take
a sheet of panel out. In case that panels
and tiles install
in the same line, take 9 sheet of tile.
2. Make sure no water
enters the bottoms of panels directly.
3. In case of defective
installation of double floor, it is available
to be covered. |