Partition, jointing
Partition and joint on the floor based on construction standard joint or execution drawing.
  Installation of FLOOR panel
Lay M panel along the standard line of floor from center outward in connection with L panel. Insert S panel when you finish installing M panel and L panel.
  Space treatment around wall and pillar
Fill the space around the wall or pillar using border panel, filling border and cushion materials.
 
  Lay tile carpet
Lay tile carpet in the way it may overlap about 80 cm vertically and horizontally focusing on M panel and continue to lay out the tile depending on partition of tile carpet.
  Finish  
* Do not transport while lifting each panel when you remove M and S panel for wiring.
You may get hurt as panel may fall down.
* Be careful not to touch wiring device with water when you clean.